GROUND SUPPORT SYSTEM SPECIFICATION (TEST OPERATION PLAN) VOLUME I, PART II. MAINTENANCE ANALYSIS SPECIFICATION (TEST OPERATION PLAN),

Abstract

This Maintenance Analysis Specification (Test Operation Plan), Volume I, Part II of the Dyna Soar (Step I) Program, ''Ground Support System Specification (Test Operation Plan)'', presents the maintenance requirements of the Dyna Soar (Step I) Primary Guidance Subsystem (PGS). The operational support requirements of the PGS are presented in the Operational Ground Support Equipment System Specification (Test Operation Plan) (OGSESS), Volume I, Part I of this document. The maintenance requirements presented are based on the support needs of the Primary Guidance Subsystem (PGS) and the operational support equipment. The elements of the PGS shall include the Inertial Guidance Subsystem (IGS), the Secondary Attitude Reference Subsystem (SARS), and the Guidance Malfunction Detection Subsystem (GMDS). The Primary Guidance Subsystem Associate Contractor (PGSAC) will furnish all the elements of the PGS and the Associated Aerospace Ground Equipment (AGE) (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 20, 1961
Accession Number
AD0431032

Entities

People

  • I. G. Rohlfs

Organizations

  • Honeywell International, Inc.

Tags

DTIC Thesaurus Topics

  • Contractors
  • Detection
  • Ground Support
  • Ground Support Equipment
  • Guidance
  • Inertial Navigation
  • Maintenance
  • Maintenance Requirements
  • Malfunctions
  • Navigation
  • Navigational Equipment
  • Specifications
  • Test Equipment

Fields of Study

  • Engineering
  • Physics

Readers

  • Life Cycle Cost Analysis
  • Missile Defense Systems.
  • Software Engineering

Technology Areas

  • Space
  • Space - Satellites