PRODUCTION ENGINEERING MEASURE FOR TYPE 7890 SUPER POWER HYDROGEN THYRATRON.

Abstract

Two tubes were assembled and one given initial tests and a life test during the past period. The life test was possibly influenced by the lack of several proper parts in the tube which was constructed as a calculated risk. The life test did not run to the specified minimum time and indicated that greater reservoir capacity was necessary. Construction features of the next tubes in the series are detailed and discussed. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 07, 1963
Accession Number
AD0432211

Entities

People

  • C. L. Shackelford

Tags

DTIC Thesaurus Topics

  • Construction
  • Engineering
  • Hydrogen
  • Life Tests
  • Manufacturing Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Reservoirs
  • Thyratrons

Readers

  • Electrical Engineering
  • Software Engineering
  • Systems Analysis and Design