PRODUCTION ENGINEERING MEASURE ON HIGH PERVEANCE CATHODE-RAY TUBES.

Abstract

In the absence of firm technical specifications, all device construction has been halted. No firm contract completion schedule can be made until the revised specifications are complete and approved. Efforts this quarter were limited to proving out production tooling, preparing testing equipment for the production phase of the contract, and obtaining lightoutput and life-test minimum-hours requirements. (Author)