PRODUCTION ENGINEERING MEASURE FOR TYPE FW-202 BARRIER GRID STORAGE TUBE.
Abstract
Five barrier grid tubes were assembled and exhausted. The first tube, serial no. 1001, was tested and had normal operation, for beam current and repeater and cancellation tests. The five tubes manufactured exhibited poor beam current characteristics. Target bonding processing and assembly problems were overcome. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 1963
- Accession Number
- AD0434067
Entities
People
- D. D. Duggan