PRESSURE SUIT PRE-FLIGHT SYSTEM. ACTIVITIES, REQUIREMENTS, AND SPECIFICATIONS
Abstract
This report presents a basis for evaluating pressure suit ready rooms, both shipboard and shorebased. Recommended ideal facilities and equipment for dressing and locker areas, administrative areas, maintenance areas, and briefing areas are given. The facilities and equipment are directly keyed to the activities of the personnel for whom the areas are designed and the requirements which these activities imply. An important contribution of the research reported is the method presented for updating the evaluation standards as activities and requirements change.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1962
- Accession Number
- AD0434193
Entities
People
- William P. Shanahan
- William S. Barker