PRODUCTION ENGINEERING MEASURE TO INCREASE THE RELIABILITY OF THE TRANSISTOR TYPE 2N2034.

Abstract

For tasks 1, 2, 4 and 5, process improvements have been made and new procedures have been established. Initial data obtained confirmed the choices in Tasks 4 and 5. Additional test data is required to substantiate the choices in Task 1 and 2. Task 7 is considered to be more than 50% complete. Because of the problems encountered in scribing in Task 3, a new equipment is being procured. While Task 6 had not been started during this quarter, dry boxes had been used on the PEM pilot line. A detailed discussion of the work on the process improvements is reported, and the work on reliability evaluation is also reported. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 31, 1963
Accession Number
AD0435476

Entities

People

  • Eric W. Martin
  • F. Des Roches
  • J. Cocking
  • J. Courier

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Electronic Components
  • Electronic Equipment
  • Engineering
  • Manufacturing Engineering
  • Modules (Electronics)
  • Performance (Engineering)
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Reliability
  • Test And Evaluation
  • Transistors

Readers

  • Software Engineering