SHOCK ABSORBER SYSTEM FOR CONNECTING 3 X 15 CAUSEWAY TO LST.
Abstract
Suitable gear and techniques are needed for connecting an LST to a 3 x 15 pontoon causeway in the surf. Three methods of connection were developed and tested. Test results indicate that spring-mounted bumpers integral with the causeway are a satisfactory method for joining and maintaining a connection with an LST in a 6-foot surf. It was concluded from observations of the shock absorber barge during tests that the system is feasible. It is recommended for in-service testing. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 08, 1964
- Accession Number
- AD0436016
Entities
People
- G. D. Mcdougall
- R. C. Towne
Organizations
- Naval Facilities Engineering Service Center