PRODUCTION ENGINEERING MEASURE TYPE 2N1016B SILICON ALLOY TRANSISTOR.

Abstract

Information concerning the completion of five phases of process improvement is discussed. Mention is made of the substitution of one phase which will be reported as completed in the final report. Additional information concerning the step stress program is presented. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 31, 1963
Accession Number
AD0436328

Entities

Organizations

  • Westinghouse Electric Corporation

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Alloys
  • Elements
  • Engineering
  • Group 14 Elements
  • Manufacturing Engineering
  • Metalloids
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Silicon
  • Silicon Alloys
  • Transistors

Readers

  • Semiconductor Device Technology
  • Systems Analysis and Design
  • Technical Research and Report Writing.