PRODUCTION ENGINEERING MEASURE TO IMPROVE PRODUCTION TECHNIQUES AND INCREASE THE RELIABILITY OF THE 2NI358A TRANSISTOR.
Abstract
This report is a review of the work during the seventh quarter, October 30, 1963, to January 30, 1964. During this quarter the sixth quarterly report was submitted. This report reviews the status of the evaluation programs on three of the process and equipment programs. Favorable results are now being attained with the unit size crystal growing facilities. Failure rates and graphs of parameter distributions of Milestone V tests are included in this report. The high temperature storage test results were excellent bettering the goal in the contract. The high stress operating life test results again showed improvement of both stability and failure rate. The report contains a discussion of the Final Proof Test program, and a section about special tests conducted to identify early turn-on failures on high-stress operating life tests. Results of the Milestone V failure analysis program are presented. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 30, 1964
- Accession Number
- AD0436871
Entities
People
- J. C. Kuhns
Organizations
- General Motors