PROGRAM 624A - TITAN III, INERTIAL GUIDANCE SYSTEM. RELIABILITY AND QUALITY ASSURANCE PROGRAM STATUS.
Abstract
Development of the Program 624A - TITAN III Inertial Guidance System during the period 1 January through 31 March 1964 proceeded on schedule. Satisfactory progress was made in all areas of system design and development, test program preparation, reliability and quality assurance, and related support activities. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 30, 1964
- Accession Number
- AD0437494
Entities
Organizations
- General Motors