PRODUCTION ENGINEERING MEASURE FOR TYPE 7890 SUPER POWER HYDROGEN THYRATRON.

Abstract

Work to produce a satisfactory tube using the 13 slot grid structure was continued. Tubes 5 and 6, started during the previous period, were processed. Tube 6A was lost during brazing operations. Tube 7 was assembled, processed, tested and operated sucessfully for 560 hours at Operation (1) life test conditions. Another tube, 8, also having the 13 slot grid had its envelop assembled at the end of the period. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 07, 1963
Accession Number
AD0439241

Entities

People

  • C. L. Shackelford

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Engineering
  • Hydrogen
  • Life Tests
  • Manufacturing Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Thyratrons

Readers

  • Electrical Engineering
  • Metallurgy
  • Software Engineering