PRODUCTION ENGINEERING MEASURE PBSE INFRARED DETECTORS - TYPE IR-200.
Abstract
Work accomlished in this quarter is as follows: Fabrication of test equipment was completed and equipment performance was satisfactorily evaluated. The preproduction test facilities description was submitted and preproduction approval requested. Specification changes to SCS-34A were requested in coordination with USAEMA. Inspection test procedures for the new test equipment were prepared and included as part of the Quality Assurance Manual which has been submitted for approval. Fabrication of the preproduction units has commenced. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 30, 1964
- Accession Number
- AD0439410
Entities
People
- G. H. Cook