PRODUCTION ENGINEERING MEASURE FOR THE MANUFACTURE OF DEFLECTRON DEVICES.

Abstract

This is the Sixth Quarterly Report describing the progress of the USAEMA contract, Production Engineering Measure for the Manufacture of Deflectron Devices. The major portion of this work period was devoted to the preparation of engineering samples and further refinement of the evaporation technique. Evaporation equipment has been completed and put into operation. All parts necessary for the completion of the program are either on hand or ordered to be supplied by approved vendors as required. Test and performance characteristics for the three models of the Deflectron are being finalized. (Author)

Document Details

Document Type
Technical Report
Publication Date
Nov 14, 1963
Accession Number
AD0439485

Entities

People

  • W. J. Noroski Jr.

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Contracts
  • Engineering
  • Evaporation
  • Manufacturing Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity

Readers

  • Software Engineering