7486 CERAMIC TRIODE PRODUCTION ENGINEERING MEASURE.
Abstract
The preproduction phase has been completed. Life tests have been completed in which effects of ion pump vacuum exhaust equipment are compared with oil diffusion exhaust. Preparation of the Quality Control and Inspection Manual is in process. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 31, 1963
- Accession Number
- AD0439494
Entities
People
- J. D. Marshall
Organizations
- General Electric