SPECIAL TEST EVALUATION REPORTS - STP III ECP 51 SYSTEM COMPATIBILITY TEST - ST-114,

Abstract

Four equipment configurations were tested as follows to evaluate equipment compatibility. The Flatbed Trailer was positioned facing the aft end of the T/E, the ECU was loaded and the ducting was connected between the ACU and the T/E during the first configuration. In the second configuration the aft end of the trailer was positioned to the aft end of the T/E, the ACU was loaded, and the ducting was connected. The Flatbed Trailer was positioned perpendicular to the T/E axis and the ducts connected to the SSCBM ports. The Flatbed Trailer/ACU was connected to the Escort Vehicle pintle hook during the final configuration. The air flow to the T/E was not adversely affected by the ECP 51 hardware and no safety hazards were encountered. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 29, 1964
Accession Number
AD0442014

Entities

People

  • D. M. Raulston

Organizations

  • Boeing

Tags

DTIC Thesaurus Topics

  • Air Flow
  • Flow
  • Test And Evaluation
  • Test Equipment

Readers

  • Electrical Engineering
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Maritime and Naval Warfare Studies