X-22A TRI-SERVICE V/STOL AIRCRAFT
Abstract
Designs and release of drawings to manufacturing for fabrication of parts is progressing. Weight Control effort has been maintained, and changes in the target weight are fluctuating with the release of detail design and due to many adjustments resulting from subcontracted systems and changes authorized by Cockpit Mockup Inspection. All changes resulting from Cockpit Mockup Inspection are presently being packaged for formal submittal to BuWeps. Reduction of wind tunnel data from the 1/5 scale, 1/7 scale, and ground effects models progressed. Test preparations for continued wind tunnel model tests were made. The Acoustic Noise Test of the fuselage test specimen as well as the Salt Spray tests and Low cycle-high stress fatigue tests of maraging steel specimens were all completed.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 1963
- Accession Number
- AD0442858
Entities
People
- A. J. Marchese
Organizations
- Bell Aircraft Corporation