A LINEAR PROGRAMMING SCHEDULING MODEL,

Abstract

The problem of scheduling several projects each of whose completion requires a known length of time and known amounts of different types of skilled manpower per unit of time is considered. It is assumed that the starting dates for each project may vary between given limits and that the availabilities of manpower per each unit of time are known. A linear programming model is constructed which generalizes other known models. (Author)

Document Details

Document Type
Technical Report
Publication Date
Aug 20, 1964
Accession Number
AD0447536

Entities

People

  • A. G. Azpeitia

Organizations

  • Naval Facilities Engineering Service Center

Tags

DTIC Thesaurus Topics

  • Availability
  • Computer Programming
  • Linear Programming
  • Manpower
  • Scheduling (Production)

Fields of Study

  • Mathematics

Readers

  • Life Cycle Cost Analysis
  • Mathematical Modeling and Probability Theory.