XV-5A LIFT FAN FLIGHT RESEARCH AIRCRAFT
Abstract
During the ninth quarter (November 16, 1963 to February 15, 1963) progress under the propulsion system program included: (1) seven technical program reports completed and transmitted to TRECOM with the remaining data necessary for low speed flight clearance nearing completion; (2) revision to maintenance manual completed; (3) propulsion system spare parts, quantities, price control, and authority for use established with TRECOM; (4) spare J85 engines, one lift fan, one pitch fan, plus engine and fan spare components packaged for shipment to Edwards; (5) provided propulsion system support during aircraft ground tests; and (6) preparation for full scale wind tunnel test was completed in terms of detail test plan, instrumentation, test fixtures, and data reduction program.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1964
- Accession Number
- AD0447839
Entities
Organizations
- General Electric