AN EXPERIMENTAL INVESTIGATION IN A MODEL TUNNEL TO DETERMINE THE STARTING AND RUNNING PRESSURE RATIO REQUIREMENTS OF THE PWT 16-FOOT SUPERSONIC TUNNEL AT M = 3.5 TO 6.0

Abstract

A determination of the minimum pressure ratios required for starting and running in the PWT, Supersonic (16S) was required in the Mach number range from 3.5 to 6.0 because of the work now in progress to extend the Mach number range of that facility. Estimates of these requirements were determined by tests in the AWT, Supersonic (1S) model tunnel. For these tests the variable geometry diffuser contained a closed-off scoop, and a model was installed in the test section. The results of these tests indicate that for Tunnel 16S the minimum starting pressure ratio requirements vary from 58 percent normal shock recovery at M = 3.50 to 45 percent at M = 5.85. The minimum running requirements vary from 112 normal shock recovery at M = 3.50 to 85 percent at M = 5.85.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1964
Accession Number
AD0451306

Entities

People

  • F. M. Jackson
  • P. F. Blanchard

Organizations

  • Arnold Engineering Development Complex

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Accuracy
  • Boundary Layer
  • Calibration
  • Data Reduction
  • Diffusers
  • Geometry
  • Government Procurement
  • Instrumentation
  • Mach Number
  • Measurement
  • Measuring Instruments
  • Pressure Measurement
  • Recovery
  • Supersonic Wind Tunnels
  • Test Facilities
  • Transducers
  • Wind Tunnels

Fields of Study

  • Physics

Readers

  • Fluid Dynamics.
  • Software Engineering

Technology Areas

  • Hypersonics
  • Hypersonics - Hypersonic Flow