X-22A TRI-SERVICE V/STOL AIRCRAFT

Abstract

Effort during the period was concentrated on the completion of aircraft No. 1 (Bu No. 1520) and on efforts required to continue the transmission system formal qualification on the test stand. Engineering liaison continued with shop and laboratory efforts. Flight test instrumentation progressed and test procedures were reviewed for coordinated efforts. During March, the empty weight calculation for the aircraft increased 13.7 pounds to a total of 549.8 pounds over target. The increases were in access door additions, general interference and installation changes, landing gear and electrical installation. The Spin model test report was submitted to BuWeps. Analyses and test report preparation continued on the 1/3 and the Full scale powered duct models. Activity on the powered Free Flight model is expected to resume in April. The second aircraft set of components have progressed, paced by the vendors completion of the duct support tubes, their splining and mating with the harmonic drive units. The wing, fin and other components are completed for final assembly installation.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 15, 1965
Accession Number
AD0465214

Entities

Organizations

  • Bell Aircraft Corporation

Tags

Communities of Interest

  • Air Platforms
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Aircraft Industry
  • Aircrafts
  • Airframes
  • Assembly
  • Checkout Procedures
  • Engineering
  • Fabrication
  • Fuselages
  • Landing Gear
  • Landing Gear Doors
  • Manufacturing
  • Model Tests
  • Propulsion Systems
  • Short Takeoff Aircraft
  • Static Tests
  • Test And Evaluation

Readers

  • Aerodynamics/Aeronautics.
  • Aerospace Test and Evaluation
  • Software Engineering