INTRACONS CARGO INTRANSIT CONTROL FOR MATS. PART 1.

Abstract

The overall plan for the development and implementation of the new intransit control system in MATS was as follows: (1) establishment of operational intransit control system objectives; (2) design of an optimum system through analysis of procedural and equipment alternatives responsive to earlier established objectives; Appropriate recommendations were to be made regarding system conversion, acquisition and operation, including hardware, software, procedures, staffing, training, and maintenance requirements; (3) procurement and implementation and assistance for the system designated as practical and most responsive to MATS' intransit control objective; (4) service test of a representative terminal system embodying the above recommendations. The test would be designed to evaluate the adequacy of the objectives and the measures developed to attain them. (Author)

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1965
Accession Number
AD0471253

Entities

Organizations

  • Arthur D. Little

Tags

DTIC Thesaurus Topics

  • Acquisition
  • Control Systems
  • Conversion
  • Maintenance
  • Maintenance Requirements
  • Procurement
  • Terminals

Readers

  • Military Logistics and Supply Chain Management
  • Software Engineering