AN ECONOMICAL FLAT PACKAGE FOR INTEGRATED CIRCUITS.

Abstract

This report is a summary of the work completed in developing an economical flat package for integrated circuits. This is covered by a design description, processing details, a pilot line description, production cost estimates and reliability test results. The period of this contract was 16 months. (Author)

Document Details

Document Type
Technical Report
Publication Date
Oct 17, 1965
Accession Number
AD0474240

Tags

DTIC Thesaurus Topics

  • Circuits
  • Contracts
  • Cost Estimates
  • Costs
  • Integrated Circuits
  • Production
  • Reliability

Fields of Study

  • Engineering

Readers

  • Software Engineering