SST PHASE IIB.

Abstract

Contents: Configuration Design and Development; Performance; Structures; Propulsion; Systems; Design Support and Integration; Mockup and Flight Deck Provisions; Economics; Model Specifications; Program Management, Titanium Fabricating Costs; Phase 3 lanning; and Long Lead Time Implementation.

Document Details

Document Type
Technical Report
Publication Date
Feb 08, 1965
Accession Number
AD0479229

Entities

Organizations

  • Boeing

Tags

DTIC Thesaurus Topics

  • Economics
  • Flight Decks
  • Lead Time
  • Program Management
  • Scheduling (Production)
  • Ship Decks
  • Ship Structural Components
  • Specifications
  • Structural Components
  • Systems Management
  • Time
  • Titanium

Fields of Study

  • Physics

Readers

  • Aerospace Engineering
  • Software Engineering