LASA. OPERATION AND MAINTENANCE.
Abstract
The major areas of effort were: (1) routine maintenance of the signal acquisition system: (2) installation of the analog recording filter and pinboard system at the LASA Data Center: and (3) engineering work on the various study programs (plastic casing, Seismograph noise, phase shift, temperature effects, and remote amplifier gain measurements). (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 09, 1966
- Accession Number
- AD0480411
Entities
People
- Dean B. Rabenstine
Organizations
- Teledyne Technologies