PM-1 NUCLEAR POWER PLANT CATEGORY III SYSTEM/COMPONENT TESTS,
Abstract
Performance testing data were compiled and evaluated for 13 specific performance evaluation areas. Each is detailed as a section of the report. It was concluded that further consideration should be given to improve the performance of: the main air cooled condenser, the main generator frequency and voltage control, over-all instrumentation calibration and general control system tuneup, the primary coolant makeup source and the tritium levels in the primary systems. Remedial action may be required in certain of these areas.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1966
- Accession Number
- AD0482637
Entities
People
- Howard C. Zachman
- Leigh D. Hassell
- Peter Reichelsdorfer
- Ronald Dugas
- William C. Hall