PROGRAM 624A QUARTERLY RELIABILITY AND QUALITY ASSURANCE REPORT. VOLUME 1. RELIABILITY
Abstract
Six previously reported reliability problems and one new reliability problem was worked in this reporting period. Five of the 7 reliability problems were closed during this quarter. The Design Assurance Test Program progressed on schedule during this reporting period. Vibration and acoustic data obtained during flight of Article 11 are being analyzed, and the results of this analysis will be incorporated in the flight test report on Article 11. Acoustic and vibration studies on the Vehicle 10 payload were completed during this reporting period with special emphasis placed on the possibility of reducing the acoustic environment within the payload fairing and the study of the sources of acoustic attenuation. Acoustic, vibration, and shock criteria studies on MOL-HSQ secondary payload, Article 9, progressed on schedule during this quarter and are scheduled for completion during the third quarter, 1966.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1966
- Accession Number
- AD0486594