MOTOR STORAGE STUDIES PROGRAM PLAN. WEAPON SYSTEMS 133A AND B. VOLUMES I AND 2
Abstract
The Minuteman stage III motor storage studies are comprised of three major tasks: Motor Storage, Laboratory Support, and Failure Criteria Development. The program plan since initiation in 1958 has been continually updated for AFBSD. In December 1965 Hercules received contractural coverage to divide the program plan into two volumes, one volume to contain the effort for which the engineering responsibility is to be transferred from AFSC to AFLC (Wings I through V motors and components), and the other volume to contain the effort for which the engineering responsibility will remain with AFSC after 1 July 1966.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1966
- Accession Number
- AD0487916