ATLAS Plan VII

Abstract

The series of charts summarizes a detail program plan which has been proposed for the accelerated Atlas Program. Included are some background, recommendations concerning management of the program, a description of the missile configuration which is the basis of this plan, schedules, facility requirements, and cost estimates. Finally, estimated decision dates and required contract changes and amendments are shown.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1954
Accession Number
AD0494139

Entities

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Buildings And Structures
  • Classification
  • Contractors
  • Contracts
  • Cost Estimates
  • Costs
  • Manufacturing
  • Organizational Structure
  • Quality Control
  • Security
  • Test Facilities

Readers

  • Business Analytics
  • Life Cycle Cost Analysis