Lessons Learned, Headquarters, 39th Engineer Battalion (Combat).

Abstract

During the report period the battalion concentrated increased effort on the upgrade and maintenance of QL-1 from QUANG NGAI to MO DUC. In addition to this LOC project, the battalion was given the responsibility for the upgrade of an additional 16 km of QL-1 from MO DUC to DUC PHO. Other projects during the period included the construction of 11 defensive bunkers and 2 observation towers for CHU LAI Defense Command, the upgrade of the DUC PHO helipad, the repair of 6 bridges on QL-1 and minesweeps of 59.1 km of QL-1 daily.

Document Details

Document Type
Technical Report
Publication Date
Aug 10, 1969
Accession Number
AD0505555

Entities

Organizations

  • Adjutant General's Corps

Tags

DTIC Thesaurus Topics

  • Construction
  • Engineers
  • Lessons Learned
  • Maintenance
  • Observation

Readers

  • Library and Information Science/ Studies, Southeast Asia Studies, Bibliography of Vietnam and Lao Studies.
  • Naval Mine Countermeasure Systems Development.