PRODUCTION ENGINEERING MEASURE FOR VOLTAGETUNABLE MAGNETRONS.
Abstract
The various problem areas and their solutions are stated for the two package types. The results and conclusions of the filament-growth investigation are discussed. The latest yield percentages obtained for the basic tube assembly are given. The status of the preproduction run for the ZM-6103 and ZM-6104 packages is described. Results in the quality-control area on the procedures for procuring filaments are given.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 18, 1964
- Accession Number
- AD0600094
Entities
People
- E. G. Soulier
Organizations
- General Electric