PCM/PS TELEMETRY SYSTEM TEST. TASK IV: LONG RANGE COMMUNICATIONS. PHASE 2 ADVANCED PCM/PS. ADVANCED R/V PROGRAM PLAN.
Abstract
This report describes the method and results of testing a PCM/PS telemetry system, and the system performance capability under simulated conditions of doppler shift, adverse signal to noise ratios, and incidental phase inversion of the signal due to antenna pattern variations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1961
- Accession Number
- AD0600633
Entities
People
- A. J. Machuta
Organizations
- General Electric