PRODUCTION ENGINEERING MEASURE. PBSE INFRARED DETECTORS-TYPE IR-200.

Abstract

Approval of test facilities was obtained from USAEMSA. Recommended changes to the specifications of SCS-34A were obtained from USAEMSA. The preproduction run was not completed due to schedule delays and processing problems. Several manufacturing and inspection procedures were revised to reflect corrective actions and improvements. Approval was received for the Inspection and Quality Control Plan submitted to USAEMA. Contract schedule extension was requested and granted. (Author)

Document Details

Document Type
Technical Report
Publication Date
May 27, 1964
Accession Number
AD0600713

Entities

People

  • G. H. Cook

Tags

DTIC Thesaurus Topics

  • Buildings And Structures
  • Contracts
  • Detectors
  • Engineering
  • Infrared Detectors
  • Inspection
  • Manufacturing
  • Manufacturing Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Quality Control
  • Specifications
  • Test Facilities

Readers

  • Software Engineering