7486 CERAMIC TRIODE PRODUCTION ENGINEERING MEASURE.
Abstract
The Inspection and Quality Control Plan was submitted and found acceptable. In the pilot production phase, fabrication of tubes was completed. Testing to the applicable specification was completed with the exception of life tests. A bill of materials was prepared and submitted. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1964
- Accession Number
- AD0601185
Entities
People
- J. D. Marshall
Organizations
- General Electric