BL-221 70 GC MAGNETRON PRODUCTION ENGINEERING MEASURE.
Abstract
The following activities and work were pursued during this quarterly period. Five magnetrons were accepted at Final Qualification Test during March 1964. Three magnetrons were made to check hot frequency using anodes from available hobs. Parts are nearly complete for pilot production run. Negative results were obtained for tests eliminating hand de-burring and spark machining of the transformer slot. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- May 06, 1964
- Accession Number
- AD0601744
Entities
People
- Robert C. Sibley