INDUSTRIAL PREPAREDNESS STUDY. LACQUER FILM CAPACITORS.

Abstract

Effort was directed toward the completion of the polycarbonate capacitor pilot run production and testing program. The capacitors successfully completed the contractor inspection organization, the contractor quality audit organizations and government quality audit inspection. Environmental tests were begun. The pilot run successfully completed the salt fog, temperature and immersion cycling, moisture resistance, capacitance change with temperature, life, shock and acceleration tests. The lot is being tested on vibration having been delayed due to the load on vibration equipment. (Author)

Document Details

Document Type
Technical Report
Publication Date
May 25, 1964
Accession Number
AD0602094

Entities

People

  • J. B. Rawls

Tags

DTIC Thesaurus Topics

  • Capacitance
  • Capacitors
  • Contractors
  • Environmental Tests
  • Governments
  • Industrial Equipment
  • Industrial Preparedness
  • Inspection
  • Moisture
  • Moistureproofing
  • Production
  • Resistance
  • Vibration

Readers

  • Government Contracting/Procurement.
  • Software Engineering
  • Surface Coatings Technology.