ON SHELTER COSTS
Abstract
Studies on optimizing blast shelter programs revealed that a shelter cost-hardness relationship is required in order to design programs and measure their performance. The paper presents the results of a limited effort to develop a simple cost function for blast shelters.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 11, 1964
- Accession Number
- AD0602846
Entities
People
- Robert A. Krupka