PRODUCTION ENGINEERING MEASURE ON HIGH PERVEANCE CATHODE-RAY TUBES.

Abstract

Transfer of tube construction from the laboratory to the manufacturing area resulted in a marked increase in incidence of cathode failure. Experiments conducted to determine the cause of this cathode problem pointed to ion bombardment of the cathode during the reflex mode of operation. Attempts were made to minimize the ion bombardment condition while maintaining tube performance. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 08, 1964
Accession Number
AD0602859

Entities

People

  • Edward T. Rate

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Advanced Manufacturing
  • Cathode Ray Tubes
  • Construction
  • Engineering
  • Ion Bombardment
  • Manufacturing
  • Manufacturing Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity

Fields of Study

  • Physics

Readers

  • Electronics Engineering
  • Thin Film Deposition Science.