PRODUCTION ENGINEERING MEASURE FOR THE MANUFACTURE OF DEFLECTRON DEVICES.

Abstract

The program was advanced to the point where all is ready for the beginning of the preproduction and pilot-run phases of the contract. Processing details were established and approved. Final modifications to the equipment were made and checked out under actual operating conditions. Engineering samples have been completed and shipped to the Contracting Agency. The engineering samples underwent a thorough electrical evaluation, thereby finalizing the test- and performance-characteristics for the three models of Deflectron. A revised test specification was written for all three Deflectron tube types. All parts and materials necessary for the completion of the program are on hand. (Author)

Document Details

Document Type
Technical Report
Publication Date
Feb 14, 1964
Accession Number
AD0602860

Entities

People

  • W. J. Noroski

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Contracts
  • Engineering
  • Manufacturing Engineering
  • Materials
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Specifications
  • Test And Evaluation

Readers

  • Software Engineering