PRODUCTION ENGINEERING MEASURE FOR ROLLED CERAMIC CAPACITORS.

Abstract

Work was done in making changes to the electroding equipment. Although the silk screen machine has eliminated some of the objectionable characteristics of the formerly used transfer wheel, several new problems arose due to the critical alignment required between the front and back electrodes and spacing between electrodes. These are being taken care of. It was also found necessary to change to a faster drying metallic paste, to reduce warpage in the strip drying ovens. The semi-automatic lead equipment was revised. Sample units are being made to test the revisions to the equipment as required. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 09, 1963
Accession Number
AD0603131

Entities

People

  • M. J. Shoemaker

Tags

DTIC Thesaurus Topics

  • Automatic
  • Capacitors
  • Ceramic Capacitors
  • Electrodes
  • Electronic Components
  • Electronic Equipment
  • Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity

Readers

  • Aerospace Test and Evaluation
  • Metallurgy
  • Systems Analysis and Design

Technology Areas

  • Space