PRODUCTION ENGINEERING MEASURE FOR ROLLED CERAMIC CAPACITORS.

Abstract

The dielectric sheet casting and Cerol winding equipments, felt to require the most engineering, have been designed and constructed. The electroding, color coding and final test equipments have also been constructed. The lead attaching and termination equipment have not been designed, but experimental work is in process which will show the direction the designs should take. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 09, 1961
Accession Number
AD0603132

Entities

People

  • J. D. Cronin

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Capacitors
  • Ceramic Capacitors
  • Coding
  • Color Coding
  • Electronic Components
  • Electronic Equipment
  • Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Test Equipment

Fields of Study

  • Materials science

Readers

  • Electrical Engineering
  • Software Engineering