PRODUCTION ENGINEERING MEASURE FOR THE IMPROVEMENT OF GERMANIUM ALLOY POWER TRANSISTORS.
Abstract
Engineering design changes have been completed and evaluated. The new process and production techniques have been evaluated and implemented into the production line flow. All units in the final production run were assembled according to conditions specified in the final contract agreement. Quality Control procedures have been reviewed. The Q. C. Manual will be included in the final report. Final reliability proof testing is in process. An improved failure rate is indicated, but at this date the data is insufficient to draw final conclusions. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 31, 1964
- Accession Number
- AD0604196
Entities
People
- Jeremiah A. Loconte
- Lucille T. Kelley