PRODUCTION ENGINEERING MEASURE FOR THE IMPROVEMENT OF GERMANIUM ALLOY POWER TRANSISTORS.

Abstract

Engineering design changes have been completed and evaluated. The new process and production techniques have been evaluated and implemented into the production line flow. All units in the final production run were assembled according to conditions specified in the final contract agreement. Quality Control procedures have been reviewed. The Q. C. Manual will be included in the final report. Final reliability proof testing is in process. An improved failure rate is indicated, but at this date the data is insufficient to draw final conclusions. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jan 31, 1964
Accession Number
AD0604196

Entities

People

  • Jeremiah A. Loconte
  • Lucille T. Kelley

Tags

Communities of Interest

  • Energy and Power Technologies
  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Agreements
  • Alloys
  • Contracts
  • Engineering
  • Germanium
  • Germanium Alloys
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Quality Control
  • Reliability
  • Transistors

Readers

  • Life Cycle Cost Analysis
  • Software Engineering.
  • Technical Research and Report Writing.