PRODUCTION ENGINEERING MEASURE FOR IMPROVED RELIABILITY OF SOLID ELECTROLYTE TANTALUM CAPACITORS.

Abstract

The remaining materials evaluation tasks have been completed this quarter. Work on Anode Pressing, Anodization and Reformation is finished except for Specification Review. Presintering studies have uncovered some possible deficiencies in the binder/lubricant selected for study. Improvements in furnace design and control have been made. Work on Specifications continues and the major portion of the work is expected to be done by the end of next quarter. The Assembly tasks have been started and some new equipment obtained. It is anticipated that the sintering and presintering phases of the program will be completed by the end of next quarter. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 29, 1964
Accession Number
AD0604434

Entities

People

  • A. W. H. Smith

Tags

DTIC Thesaurus Topics

  • Capacitors
  • Chemistry
  • Engineering
  • Manufacturing
  • Materials
  • Materials Science
  • Production
  • Production Engineering
  • Specifications
  • Tantalum Capacitors
  • Test And Evaluation

Fields of Study

  • Materials science

Readers

  • Software Engineering
  • Thin Film Deposition Science.