PRODUCTION ENGINEERING MEASURE FOR TYPE FW-202 BARRIER GRID STORAGE TUBE.

Abstract

Three barrier grid tubes were assembled and exhausted, one of which meets all test specifications. The beam current problem reported in AD-434 067 appears to be a design problem. Processes which are now standard manufacturing procedures include target bond manufacture, electrophoretic coating and vitrification of SG-67 Glass Frit, settling and vitrification of 0120 Glass Frit, copper thickening of screens, nickel and glass evaporations, target bonding, collector section assembly and dynode oxidation. Process specifications were written for all of these procedures. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 31, 1963
Accession Number
AD0604732

Entities

People

  • D. D. Duggan

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Accumulators
  • Assembly
  • Assembly Lines
  • Engineering
  • Evaporation
  • Manufacturing
  • Manufacturing Engineering
  • Mass Production
  • Oxidation
  • Production
  • Production Engineering
  • Production Management Methods
  • Specifications
  • Standards
  • Storage Tubes
  • Vitrification

Readers

  • Combustion and Flow Dynamics.
  • Electronics Engineering
  • Polymer Science and Engineering.