PRODUCTION ENGINEERING MEASURE FOR TYPE FW-202 BARRIER GRID STORAGE TUBE.
Abstract
Three barrier grid tubes were assembled and exhausted, one of which meets all test specifications. The beam current problem reported in AD-434 067 appears to be a design problem. Processes which are now standard manufacturing procedures include target bond manufacture, electrophoretic coating and vitrification of SG-67 Glass Frit, settling and vitrification of 0120 Glass Frit, copper thickening of screens, nickel and glass evaporations, target bonding, collector section assembly and dynode oxidation. Process specifications were written for all of these procedures. (Author)