C-BAND TRIODE-CAVITY OSCILLATORS, PRODUCTION ENGINEERING MEASURE.
Abstract
Special test equipment is described. The test facility has been inspected and was found to be acceptable. The second engineering sample was submitted. Modifications to the test specification were discussed. Preparations for entering the preproduction phase have been completed. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- May 29, 1964
- Accession Number
- AD0605330
Entities
People
- J. D. Marshall
Organizations
- General Electric