C-BAND TRIODE-CAVITY OSCILLATORS, PRODUCTION ENGINEERING MEASURE.

Abstract

Special test equipment is described. The test facility has been inspected and was found to be acceptable. The second engineering sample was submitted. Modifications to the test specification were discussed. Preparations for entering the preproduction phase have been completed. (Author)

Document Details

Document Type
Technical Report
Publication Date
May 29, 1964
Accession Number
AD0605330

Entities

People

  • J. D. Marshall

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Buildings And Structures
  • C Band
  • Engineering
  • Oscillators
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Signal Generators
  • Specifications
  • Test Equipment
  • Test Facilities

Readers

  • Electronics Engineering
  • Software Engineering