PRODUCTION ENGINEERING MEASURE FOR MANUFACTURE OF METEOROLOGICAL BALLOONS TYPE ML-541 ( )UM.

Abstract

The prime technical objective of this production engineering measure is to establish the capability of producing the ML-541( )/UM balloon on a pilot-run basis. This objective implies the attainment of improved quality of balloon and the achievement of uniformity in the finished balloon and its performance in flight. A second objective is the development of manufacturing methods to a high level of technology. This provides for the utilization of automatic and semi-automatic equipment whenever possible, taking into consideration that the balloon is a delicate device to handle. A goal in the design of the equipment is to anticipate technological development of meteorological balloons, and to design all equipment in such a manner that the danger of early obsolescence is practically nil. A further objective is to prepare a mobilization plan for production of the ML-541( )/UM balloon at the specified production rate. From an economic point of view, the goal of the development of improved methods of manufacture under this production engineering measure is the reduction in cost and price of this balloon.

Document Details

Document Type
Technical Report
Publication Date
Jul 18, 1964
Accession Number
AD0605546

Entities

People

  • Frank Sterne

Tags

DTIC Thesaurus Topics

  • Automatic
  • Balloons
  • Engineering
  • Manufacturing
  • Manufacturing Engineering
  • Meteorological Balloons
  • Mobilization
  • Obsolescence
  • Production
  • Production Engineering
  • Production Management Methods
  • Production Rate
  • Productivity
  • Vehicle Equipment

Readers

  • Astronomy and Astrophysics.
  • Mathematics or Statistics
  • Software Engineering