Total Impulse Measuring System for Solid Propellant Rocket Engine: Phase II Report
Abstract
Discussion and results of the two main considerations comprising the intermediate (Phase II) effort are presented: (1) fabrication and test of the component parts of the system prior to their inclusion in the system; and (2) assembly and test of the complete measurement system prior to its delivery to EAFB. Specific results of these separate but related program efforts are, respectively: (1) source inspections and tests, where needed, to determine compliance with Rocketdyne drawings and specifications, and (2) alignment measurements and detailed tests to determine that the overall system peerformance conformed to the contractual requirement of 0.1% accuracy.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1964
- Accession Number
- AD0606557
Entities
People
- V. C. Plane