INDUSTRIAL PREPAREDNESS MEASURE: MANUFACTURE OF GLASS HOLDER CRYSTAL UNITS CR-(XM-17)/U.

Abstract

This report discusses tentative plans to submit preproduction units for approval purposes. Included is a detailed description of the glass holder specifications with inspection and preparation procedures outlined. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 30, 1963
Accession Number
AD0606991

Tags

DTIC Thesaurus Topics

  • Engineering
  • Industrial Preparedness
  • Inspection
  • Specifications

Readers

  • Aerospace Test and Evaluation
  • Defense Technology Research and Development.
  • Electrical Engineering