PRODUCTION ENGINEERING MEASURE FOR MECHANIZATION OF HIGH-RELIABILITY CAPACITORS.
Abstract
Work on the production design engineering and design of pilot line equipment continues. Of the 28 major subassemblies which constitute the three machines of the mechanized high reliability capacitor production line, five are complete and another 18 are in various stages of production. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 30, 1964
- Accession Number
- AD0607501
Entities
People
- E. J. Burke
- J. H. D. Folster
Organizations
- Sprague Electric