C-BAND TRIODE-CAVITY OSCILLATORS, PRODUCTION ENGINEERING MEASURE.
Abstract
The test specifications for preproduction and pilot production testing were finalized. The cavities representing the preproduction run were assembled and tested. The Inspection and Quality Control Manual was completed and submitted. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 31, 1964
- Accession Number
- AD0607665
Entities
People
- J. D. Marshall
Organizations
- General Electric