C-BAND TRIODE-CAVITY OSCILLATORS, PRODUCTION ENGINEERING MEASURE.

Abstract

The test specifications for preproduction and pilot production testing were finalized. The cavities representing the preproduction run were assembled and tested. The Inspection and Quality Control Manual was completed and submitted. (Author)

Document Details

Document Type
Technical Report
Publication Date
Aug 31, 1964
Accession Number
AD0607665

Entities

People

  • J. D. Marshall

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • C Band
  • Engineering
  • Inspection
  • Manufacturing Engineering
  • Oscillators
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Quality Control
  • Specifications

Readers

  • Aerospace Test and Evaluation
  • Electronics Engineering