PRODUCTION ENGINEERING MEASURE FOR THE IMPROVEMENT OF GERMANIUM ALLOY POWER TRANSISTORS. FINAL RELIABILITY PROOF TESTING AND THE INDUSTRIAL PREPAREDNESS STUDY.

Abstract

This report covers the final process specifications and procedures for the manufacturing of the 2N297A type power transistor, including the bill of materials. All the process sequences which resulted from engineering tests and evaluations written in the contract are included in the final report manuals. The final reliability test results of the life testing has attained and exceeded the final reliability objective of 0.05% per 1000 hrs. at 95 C with 90% confience.

Document Details

Document Type
Technical Report
Publication Date
Jun 30, 1964
Accession Number
AD0608644

Entities

People

  • Jeremiah A. Loconte
  • Lucille T. Kelley

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Engineering
  • Failure Mode And Effect Analysis
  • Germanium
  • Germanium Alloys
  • Industrial Preparedness
  • Manufacturing
  • Manufacturing Engineering
  • Production Engineering
  • Reliability
  • Test And Evaluation
  • Transistors

Fields of Study

  • Engineering

Readers

  • Metallurgy
  • Software Engineering